Design/Build-52nd EOD Unit Operations Facility

April 26th, 2012

The project consists of two facilities – A Company Operations Facility (COF) and a Tactical Equipment Maintenance Facility (TEMF).  The COF is constructed using a pre-engineered building frame with a mezzanine upper level for platoon offices.  The lower level houses storage areas, weapons vaults, secure storage, comm. storage, lockers and individual lay-down areas.  The Administration Module is constructed using a modular metal framed system and is occupied by the Commanders, Training Officers and Senior NCO’s, with toilet and shower facilities for all parties.  The TEMF is a pre-engineered building frame with masonry interior walls, heavy duty floor slabs, 10 ton bridge crane in the service bays, weapons vaults, comsec storage, and ancillary spaces to support the ongoing maintenance operations.

 

This project includes full ATFP (anti-terrorism force protection) requirements and has been designed to achieve LEED Silver certification upon completion of the project.


CAAF Vehicle Support Facility

April 17th, 2012

This project consists of a two-story slab-on-grade, pre-engineered metal building frame structure with a concrete/metal composite upper floor deck, over the storage room/communications room/air compressor room/battery room portion of the building only, supported by steel bar joists bearing on c.m.u. walls with a total gross square footage of 12,200. The building shall support Vehicle Maintenance and Accessory Vehicle Storage operations and includes office and accessory spaces as well.

This project was one of the first awarded MILCON transformation projects in the country. Due to the MILCON transformation project requirements, strict schedule guidelines and work performance was monitored throughout construction. Lyle Cook Martin Architects was the Architect of Record for the very first MILCON transformation project in the country prior to this D/B project. This project also includes full ATFP (anti-terrorism force protection) requirements.

This project has previously received numerous high rating performance evaluations from the Project Engineer for the USACE.

Aviation Brigade Company Operations Facility – Ft. Campbell, Kentucky

April 5th, 2012

This project consists of a one-story slab-on-grade, pre-engineered metal building frame structure with a total gross square footage of 48,919 consisting of six Aviation Brigade Companies (or suites) under one roof.  This MILCON transformation project also includes full ATFP (anti-terrorism force protection) requirements.